钣金机箱加工
Your current location : Home >> News >> Company news

Contact UsContact Us

Shenzhen huifuda Precision Hardware Products Co.,

Shenzhen Huifuda Precision Hardware Products Co., Ltd.

Tel: 0755-84060086 18318819439

Fax: 0755-89944079

Email: szhuitong888@163.com

Website: www.sz-huifuda.com

Address: Building A2, No. 168, Changshan Industrial Zone, Liulian Community, Pingdi, Longgang District, Shenzhen


The company explains the operation principle of the advertising barrier and the installation of the cabinet

2020-09-21 19:18:12
Times

The company explains the operation principle of the advertising barrier and the installation of the cabinet

One. The driving principle of advertising surface of advertising barrier

Currently, there are two transmission modes for advertising barriers on the market.

One is electric transmission (that is, the so-called power transmission). The motor transmission is through the motor in the barrier rod. The barrier rod motor is connected to the advertising barrier shaft. The barrier rod first drives the motor before the landing rod. Rotate the advertising surface of the gate to 90 degrees and then lift the lever.


The company explains the operation principle of the advertising barrier and the installation of the cabinet


The second type is mechanical transmission (no power drive.) This structure is to flip while lifting the rod. The starting speed is about 1 second faster than the motor drive!

two. Host installation

1.1 Before installing the barrier, choose the installation location, which should be selected according to the following three aspects;

1), easily visible places;

2) The gear lever faces outward (intersection);

3) The road surface of the barrier should be at the same level as the ground (adjust according to the size of the safety island).

After the installation location is determined, the barrier foundation should be made according to the site conditions, and the cast-in-place foundation should be made for non-concrete ground. The concrete floor can be fixed with the provided expansion bolts.

three. Box method

1) Take out the accessories that come with the box;

2) Put the box body in the installation position, open the box door, and use a screwdriver to draw a line on the ground along the waist-shaped groove on the base;

3) Mark the position of the anchor bolts shown in the figure on the ground, and remove the box after marking;

4) Hammer 8 expansion bolt holes with a depth of 150mm-160mm, and implant expansion screws, adjust the levelness and verticality of the box, and tighten the nuts



Recently Viewed:

contact us

sk1.png  Mobile: 183 1881 9439 Mr. Xue

     Tel: 0755-84060086

sk2.png  Address: Changshan Industrial Zone, Liulian 

     Community, Pingdi, Longgang District,    ShenzhenBuilding A2, No. 168

sk3.png Email: szhuitong888@163.com

81.jpg

微信号

1653633328919325.png

手机站